OUR CONVEY TRUCKS IN ACTION

Starting to fill a HUGE hole with pea gravel

Just pulling in on the first day

Gary dumping the first load

Steve putting the boom thru a 3 foot door (remote driving truck)

 

The first yards of  2535 yards

Two trucks unloading at one time

Unloading at the North end of hole

Unloading at the South end of the hole

We have to fill to within 5 feet of the top

about 200 tons

about 400 tons

 

August 2005 ~ Planting trees ~ Microsoft ~ Redmond, WA

 

August 2005 ~ Retention Pond ~ KLB Construction ~ Issaquah, WA

 

July 2005 ~ Church addition ~ Everett, WA

 

    

September 2005 ~ Setting tanks ~  Evergreen Environmental Services ~ Monroe, WA

 

March 2006 ~ Filling Trenches ~ Boeing Pier ~ Everett, WA